Dublin Airport Terminal 2 & Pier E
The development is the biggest of its kind in Ireland. Dublin Airport Terminal 2 (T2) is a 75,000 square metre building specifically designed with travellers needs in mind making use of natural daylight to create a bright airy space.
Dublin Airport Terminal 2 (T2) is a three story curvilinear building that sits astride the main access road to Terminal 1.
The T2 project includes a new terminal building, a new departures gate area called Pier E, a new energy efficient power plant and upgrade of the airports campus road network and a multi-storey car park.
Light management system has been an important criterion in this project. The terminal will operate on KNX building management systems with all luminaires being addressable DALI.
Overall cost of the project is 609 million Euro. Glamox Ireland have supplied over 7500 luminaires to this project
Luminaries used:
C20-R,
C20-RL,
i40,
C60,
A50,
C40,
C10-S,
C10-R
This week’s project is sold by:
Barry Kelly
Lighting design:
Arup Consultant Engineers
Builder:
Dublin Airport Authority
Architect:
Pascall & Watson Architects
Main contractor:
Mace Construction Managers
Electrical consultant:
Arup Consultant Engineers
Electrical contractor:
Mercury Engineering
Photo:
Dublin Airport Authority