Dublin Airport Terminal 2 & Pier E

Lighting design:

Arup Consultant Engineers

Builder:

Dublin Airport Authority

Architect:

Pascall & Watson Architects

Main contractor:

Mace Construction Managers

Electrical consultant:

Arup Consultant Engineers

Electrical contractor:

Mercury Engineering

Photo:

Dublin Airport Authority

The development is the biggest of its kind in Ireland. Dublin Airport Terminal 2 (T2) is a 75,000 square metre building specifically designed with travellers needs in mind making use of natural daylight to create a bright airy space.

Dublin Airport Terminal 2 (T2) is a three story curvilinear building that sits astride the main access road to Terminal 1.

The T2 project includes a new terminal building, a new departures gate area called Pier E, a new energy efficient power plant and upgrade of the airports campus road network and a multi-storey car park.

Light management system has been an important criterion in this project. The terminal will operate on KNX building management systems with all luminaires being addressable DALI.

Overall cost of the project is 609 million Euro. Glamox Ireland have supplied over 7500 luminaires to this project

Luminaries used:
C20-RC20-RLi40C60A50C40C10-SC10-R